The set began as a line on paper, drawn fast and large — and what the pen put down, the carpenters built.
The instrument and the method
Ken Adam worked with a thick felt-tipped pen on large sheets of paper, and the speed of the stroke was part of the point. The drawings were not refined presentation documents produced for a client's approval; they were acts of thinking, made quickly because the decisions embedded in them had to be made quickly. A slow, measured pencil line invites revision and hedge; a broad felt-pen stroke commits. On a sheet large enough that Adam could stand over it rather than hunch above it, a single drawn line could specify the rake of a wall, the pitch of a ceiling, the angle at which a gantry met the floor far below. The construction crew did not work from a scale model first. They worked from the drawing.

This is worth pausing on, because it reversed the conventional hierarchy. Most large built environments move from sketch to model to plan before a brick is laid or a flat is bolted. Adam's process compressed that sequence. The elevation — the drawn face of a set, showing height relationships directly rather than as a plan projection — carried enough information that the construction department could begin reading it as a working document. Detail drawings followed for specific joints and mechanisms, but the governing geometry, the thing that made a particular set feel the way it felt, was in the original stroke.
The second unit scheduling action on a practical set rather than a location worked within whatever the construction department had actually built, which in turn was what the drawing had specified.
The felt pen was a relatively new instrument when Adam adopted it for the Bond films in the early 1960s. The thick, fast line it produced suited exactly what he needed: not fine architectural draughtsmanship but the communication of mass, volume and drama at a glance. Where a pencil line suggests, a broad marker declares. The drawings read, even reproduced small, as architectural statements rather than proposals. Albert R. Broccoli ↗ and Harry Saltzman could look at an Adam elevation and know immediately whether the set was worth the money it would cost, because the drawing already showed them what the set was going to feel like when actors walked through it.
What the drawings decided before construction began
The sequence of decision-making matters because Ken Adam's designs established constraints that propagated forward through every other department. John Barry scoring a scene knew, from the finished set, how much physical space the action occupied — whether the geography was intimate or overwhelming. The second unit scheduling action on a practical set rather than a location worked within whatever the construction department had actually built, which in turn was what the drawing had specified. The drawing was therefore not the first step in one department's workflow; it was the first step in the production's workflow.
Take the volcano crater interior built for You Only Live Twice at Pinewood Studios ↗ in 1966–67. The set, which became one of the most discussed in the history of film production design, was not conceived at model stage. It was drawn. Adam's elevation established the relationship between the crater walls, the interior launch pad, the monorail and the control areas at a stroke — in the drawing's proportions, the sense that a human figure would be dwarfed was already present. Once the drawing existed, the question was purely engineering and budget: how do you build a structure of that volume inside, or partly inside, a sound stage? The answer — that the set required a purpose-built stage because no existing one at Pinewood was large enough — followed from what the drawing demanded. The pen moved first; the architecture of the studio adjusted afterward.

The same logic applied to the war room set built at Shepperton for Dr. Strangelove in 1963 — a Stanley Kubrick production, not a Bond film, but made possible by Adam working in the same method. The circular table, the receding ceiling, the banks of light: all were committed in the felt-pen drawing before any construction figure was costed. The set proved so convincing that Ronald Reagan, on becoming president, reportedly asked to be shown the War Room. That response was available only because the drawing had locked in proportions that no amount of subsequent model-refinement could have improved, because the proportions were right from the beginning.

The drawing as a production document
At Eon Productions, Broccoli's unit evolved a working culture in which Adam's drawings circulated as the governing reference for a set, not a preliminary attached to some later technical package. The continuity of crew across the series — the same construction co-ordinators, the same painters, the same draughtspeople returning film after film — meant the drawings were read by people who understood Adam's conventions: what a particular kind of hatching indicated about surface finish, what a bold curved line at the edge of a drawing meant for the way a wall would meet a ceiling.
This produced a feedback loop. Because the construction department trusted the drawings and had read enough of them to decode Adam's shorthand, Adam could put more into a single line, knowing it would be interpreted correctly. The drawings became denser with intent over time — not more complex in the number of marks, but richer in what each mark carried. A draughtsperson who had worked with Adam on several films did not need a separate specification for the surface texture of a rocket silo wall; they had seen it in the drawing and in the finished set often enough to understand what the hatching meant.
The practical effect of all this was speed. Pre-production on a Bond film was never leisurely. Sets were often designed, approved and under construction while the screenplay was still being refined — a practice that required the design document to be reliable enough that the construction department could commit resources to it without waiting for script lock. Adam's drawings were reliable in that way. Their authority was total and immediate, which is why the felt pen mattered: it was not a tool for making provisional marks, and everyone on the construction floor knew it.
What the pen decided, in the end, was the look of the films — not in the way that phrase is commonly used, as a summary of colour palette and costume, but in the fundamental sense that the spatial language of production design was fixed in the moment Adam's hand moved. The scale, the angle, the relationship between a human body and the volume surrounding it: those were drawing decisions, made at a draughtsman's table, with a thick felt-tipped pen, before a single piece of timber was cut at Pinewood.